Hydrogen Park Murray Valley FEED

Front End Engineering Design (FEED)

Phase

Front End Engineering Design (FEED)

Client

AGIG

Location

Wodonga, NSW

Date/Year

2020

Momentum supported AGIG to carry out the FEED phase for the new Hydrogen Park in the Murray Valley, in regional New South Wales.

The new facility comprises of a 10MW electrolyser and will use renewable electricity to produce hydrogen from mid-2023. It is proposed to be located at North East Water’s West Wodonga Wastewater Treatment plant where it will have access to water and renewable electricity.

The installation will enable blending of up to 10% renewable hydrogen into the existing natural gas network, owned by Australian Gas Networks (AGN, part of AGIG), to supply more than 40,000 existing residential, commercial and industrial customers in Wodonga, Victoria and nearby Albury, New South Wales.